Moorreesburg WWTW

This R69 million contract, undertaken between October 2020 and January 2023, involved the upgrade and extension of the Moorreesburg Wastewater Treatment Works to 2 Mℓ/day, ...

Prieska Substation

This contract, valued at R15.6 million and carried out from November 2023 to February 2024, involved the upgrading and repair of the damaged 75MW Mulilo ...

Elands Bay – Periodic Maintenance

This R288 million project, undertaken between March 2019 and December 2021, involved the realignment and pavement upgrade of MR 535 to extend its design life ...

Ashton Bridge

his R497.9 million project, executed between May 2019 and January 2022, formed part of the rehabilitation and widening of the route between Ashton, Cogmanskloof, and ...

Wesley Wind Farm

The Wesley-Ciskei Wind Farm project involved the engineering, procurement, and construction of civil balance of plant works for a 34.5MW facility consisting of 10 wind ...

Nqadu – Rehabilitation between Nqadu and Mbokotwana River

This R1.063 billion project, executed between August 2020 and November 2023, involved the reconstruction of a single carriageway on the N2 Section 19 along with ...

Kokstad Interchange and Traffic Control Centre

The Kokstad Interchange and Traffic Control Centre project is a large-scale, multi-disciplinary contract valued at R733 million, running from September 2021 to August 2025. The ...

N1 Refinery Interchange

Located on Plattekloof Road over the N7 between Milnerton and Bothasig, this project involves the comprehensive upgrade of the Refinery Interchange to improve traffic capacity ...

Robinson Dry Dock

The Robinson Dry Dock dewatering upgrade was undertaken to modernize one of the world’s oldest dry docks, originally commissioned in 1888, as part of Operation ...

Groot Brak – Slope Stabilisation

This slope stabilisation project was executed to prevent large-scale embankment failure along a critical section of the N2 near Groot Brak. Undertaken as an H&I ...

IRT MyCiTi Bus Depot

The IRT Phase 2A Depot project in Khayelitsha supports the expansion of Cape Town’s integrated public transport system. Valued at R474 million and scheduled from ...

George WWTW

The George WTW Upgrade is a design-and-build project (FIDIC Yellow Book) focused on the expansion and rehabilitation of the 33-year-old facility, which supplies the bulk ...

Potsdam WWTW

The Potsdam Wastewater Treatment Works project represents a flagship municipal infrastructure undertaking aimed at securing long-term wastewater management capacity for one of the fastest-growing regions ...

Kestrel Main Transmission Station

Kestrel 400/132kV Main Transmission Station was awarded by Mulilo / TotalEnergies, with no external consultant appointed. This greenfield project comprises the construction of a dual-voltage ...

Quinera WWTW

The project involved the Civil, Mechanical and Electrical upgrade to the existing waste water treatment works. The electrical works consisted primarily of the manufacture and ...

Gqaga WWTW

The project involved the Civil, Mechanical, and Electrical upgrade to the Gqaga Water Treatment Works. The work included the construction of a Water Treatment Works, ...

Thornhill WWTW

This project involved the Civil, Mechanical, and Electrical upgrade to the Thornhill Water Treatment Works. The Mechanical upgrade involved the replacement of 5no. existing pumps ...

Zandvliet WWTW

This project involved the upgrade of the Zandvliet WWTW from a 72ML/day plant to a 90ML/day plant by constructing a new activated sludge reactor, utilizing ...

Zwelitsha WWTW

The project involved the Civil, Mechanical and Electrical construction of a 17.5Ml extension to the existing Wastewater Treatment Plant.  The Civil works included bulk earthworks, ...

Sandile WWTW

The project included the following elements: Construction of two 16Ml reinforced concrete reservoirs Design and pre-stressing of reservoirs Connection pipework and appurtenant valve chambers Construction ...

City of Cape Town Electrical Department

The office complex is situated on a 24,000m2 site with a building footprint of 7200m2 and serves as the City of Cape Town’s electrical department’s ...

UCT Design School

The objective of the UCT design school is to infuse students and professionals with a design thinking mindset. Design thinking is the mental approach of ...

Silikamva School

This project entailed the construction of the Western Cape government’s largest new school built adjacent to the Imizamo Yethu community in Hout Bay. Construction was ...

District Six

This residential development in the shadows of Table Mountain consists of forty-eight new two-story homes. The project required the construction of the roads and civil ...

WEX 1

WEX 1 is a ten-storey mixed-use development located in the heart of Woodstock. It comprises three levels of parking, a ground floor retail area and ...

Victoria Hospital

This project constituted the construction of a new 70-bed emergency centre with associated roads, retaining walls and parking areas. The centre comprises of a resuscitation ...

Scottsdene Taxi-Rank

This facility was constructed as one of the first ‘GREEN’ taxi facilities in the Republic of South Africa and was designed to reduce the environmental ...

Shooting Range

This project entailed the construction of a new state of the art shooting range for the South African Police Service thereby providing for a facility ...

Waste Facility

The Employer’s aim with the construction of this facility was for the processing and compaction of waste into sealed containers. The project entailed the construction ...

Saldanha Boat Yard

This contract comprised two key components, one being the construction of a 110m long quay wall with slipway (-2.5m MSL) and the second being the ...

East London Harbour

The project entailed the construction of a new combi-piled quay structure as well as the extensive rehabilitation of the severely voided fill material behind the ...

Gqeberha Harbour

The project in the Port of Gqeberha was aimed at growing and improving Transnet’s ability to service boats weighing less than 1200 metric tons.  The ...

Elandsfontein Mine

The Elandsfontein deposit is a sedimentary phosphate deposit on the West Coast of South Africa. The project entailed the construction of the civil infrastructure that ...

West Coast Wind Farm

The project entailed the Civil Balance of Plant for the construction 47 No, 2.0MW wind turbines. The project also included the construction of access roads, ...

Tsitsikamma Wind Farm

CONTRUCTION OF THE TSITSIKAMMA COMMUNITY WINDFARM The project entailed the Civil Balance of Plant for the construction 31 No, 3.0MW wind turbines. The project also ...

Chapman’s Peak Drive

Design & Construction of Chapman’s Peak Drive Following the closure of Chapman’s Peak Drive in 2000, the road was reconstructed under a concession contract between ...

Settlersway M2 Hospital Bend Upgrading

The Hospital Bend Interchange upgrade consisted of the following key elements: Widening of Rhodes Drive (M3) inbound  Pre-selection Lane from M3 (inbound) to Hospital Bend ...

N7 Atlantis South to Kalbaskraal

The upgrading of the N7 from a single carriageway to a divided dual carriageway, the construction of two grade separated interchanges, 23.3 km of access ...

N7 Leliefontein to Abbotsdale

The project comprised the upgrade of 9.54 km of National Route 7 Section 1 between Leliefontein (km 39.1) and Abbotsdale (km 48.64) in the Western ...

R61 Majola Tea to Tombo

The project entailed the construction and upgrade of the R61 (16km) between the Majola Tea turnoff to Tombo near Port St Johns. Due to the ...

N1 Wurasoord to Sydenham

Upgrade of 12,5km of National Route 1 Section 15 to a divided dual carriage and the rehabilitation of 16km of single undivided road and three ...

N10 Baviaans Rivier to Riet Rivier

The upgrading of National Route 10 to a surfaced width of 12.4 meters. The Krom River Bridge and 14 major concrete culverts required strengthening and ...

R61 Dual Carriageway & Bridges from Mthatha to Ngqeleni

The project entailed the construction of a new dual carriageway of the R61 from Mthatha to the R61/Ngqeleni intersection. The existing road was widened to ...

N7 Kransvleikloof to Clanwilliam

The realignment of the N7 between Kransvleikloof and Clanwilliam was required as advanced work for the anticipated raising of the Clanwilliam Dam. The completed works ...

N2 Gordon’s Bay T-Junction to Houw Hoek

The N2 over Sir Lowry’s Pass to Houw Hoek Hotel required maintenance in the form of appropriate localized pre-treatment, surface (Wearing Coarse – 2000 tons) ...

N1 Plattekloof UTFC

Resurfacing of 420 000 m2 of dual carriageway with a 25mm Ultra-Thin Friction Course. The existing wearing course was removed by fine milling to a depth ...

Bantry Hills

This graciously curved 13-level building has 64 uniquely designed luxury apartments, many with private swimming pools. The development consists of five tower blocks and three ...

Clifton Terraces

This exclusive residential development is located on the slopes of Lions Head overlooking the famous white Clifton beaches. A prize-winning Atlantic seaboard development with top ...

Hilton Hotel Cape Town

The project entailed the construction of the five-star luxury Hilton hotel in the Cape Town CBD. This 144 key hotel building included three levels of ...